Termination, IR Megger Testing & HIPOT Test for MV Cable 34.5 KV

Sendan

DSE Electrical Work for Feed Mill
This project included the installation of cable ways, lightning, grounding, motors, panel boards, and instrument JBs. It also involved cable laying, cable termination, and the complete electrical and control work for a newly constructed feed mill.

MV Cable Replacement
Cutting old cables from the existing duct bank and laying new cables. The work also included cable splicing and termination with PFISTERER plug-in and Raychem heat shrink terminations for MV cables, followed by testing and commissioning.

Repair of MV Cable 300/400 SQMM for Transformer
Cutting old cables from an existing duct bank and laying new cables. The work involved cable splicing and termination using PFISTERER plug-in and Raychem heat shrink terminations, followed by testing and commissioning.

Re-Routing of Instrument Cable – Ethylene Plant
Replacement of old instrument cables, installation and re-routing of new instrument cables, and installation of new RGS conduits with all required fittings and accessories.

Relocation of PLCs & Air-conditioned PLC Panels Installation for Roller Mills
Relocated slave PLCs that were dismantled from 44 roller mills and installed them into combined air-conditioned panels with input and output cable extensions.

Delmon Edible Oil Mills Yanbu
Installation of grounding rods and networks for MV & LV panels.

Yanbu National Petrochemical Company (Yansab)
Laying, IR & HI-POT testing, and termination of MV cables.

Rerouting of Instrumentation Conduiting & Cabling
Relocation of instrumentation panels, along with conduiting and cabling works for the upgrade of gas turbine stations.

Rabigh 3 Independent Water Project
The laying, termination, testing, and glanding of power and instrument cables.

HVAC Panels Replacement
The supply, installation, and replacement of an HVAC Panel, including motor connection and termination.

Marafiq TP-9
Rehabilitation of workers’ locker rooms, bathrooms, and offices.

Repair of 34.5KV XLPE MV Cable for HDPE
Removal and laying of a 12-loop cable between two transformers. It also included the installation of Raychem MV power cable indoor end termination kits and post-termination testing with VLF & IR.

Marafiq (Different Site)
Installation of motorised shutter doors at various Marafiq site locations.

E&I Construction Works of Edible Oil Bottle Filling Plant
Complete supply, installation, testing, and commissioning of electrical & instrumentation equipment. This included cable trays, cable ways, lightning, grounding, earthing, MV cables, transformers, LV & MV panels, motors, actuators, sensors, flow transmitters, PLC controllers, local stations, and slave PLC panels.

E&I Construction Works of Animal & Poultry Feed Mills
Complete installation, testing, and commissioning of electrical & instrumentation equipment. This included cable trays, cable ways, lightning, grounding, earthing, MV cables, transformers, LV & MV panels, motors, actuators, sensors, flow transmitters, PLC controllers, local stations, and slave PLC panels.

E&I Construction Works of Downstream Extension MV/LV Substation Project of Soya-2
Complete supply, installation, testing, and commissioning of MV substation panels, which included the installation, testing, oil filling, and commissioning of a 4.5 MVA transformer.