Amiral-RC Jabeen (E&I Package) – Satorp-2

Alazzaz has been awarded the Procurement & Construction (P&C) contract for the Gas Network at Jubail 2, Stage 4 – Phase 1. Our scope encompasses complete Electrical, Instrumentation, and Telecom (E&I) works. This includes the supply, installation, testing, and commissioning of utility service connections, grounding systems, raceway infrastructure, SCADA and DCS integration, fiber optic cabling, as well as sophisticated measurement and leak detection systems. Alazzaz is proud to deliver this critical infrastructure as part of the prestigious AMIRAL (SATORP-2) development.

The Yanbu Aramco Sinopec Refining Company (YASREF)

Automation SOW
Installation of Uninterruptable power supplies in 54 data centers in different locations and integration in Building management system.

Real-time UPS status monitoring (input/output voltage, frequency, battery status, load level, etc.)

Fault detection & alerts (overload, battery failure, temperature rise, etc.)

Battery health monitoring (charging cycles, estimated lifespan, replacement notifications)

Power event logging (outages, voltage fluctuations, and anomalies)

Communication protocols (SNMP, Modbus, BACnet, etc.) for remote monitoring

Sendan

Termination, IR Megger Testing & HIPOT Test  for MV Cable 34.5 KV

DSE Electrical Work for Feed Mill

This project included the installation of cable ways, lightning, grounding, motors, panel boards, and instrument JBs. It also involved cable laying, cable termination, and the complete electrical and control work for a newly constructed feed mill.

MV Cable Replacement

Cutting old cables from the existing duct bank and laying new cables. The work also included cable splicing and termination with PFISTERER plug-in and Raychem heat shrink terminations for MV cables, followed by testing and commissioning.

Repair of MV Cable 300/400 SQMM for Transformer

Cutting old cables from an existing duct bank and laying new cables. The work involved cable splicing and termination using PFISTERER plug-in and Raychem heat shrink terminations, followed by testing and commissioning.

Re-Routing of Instrument Cable – Ethylene Plant

Replacement of old instrument cables, installation and re-routing of new instrument cables, and installation of new RGS conduits with all required fittings and accessories.

Relocation of PLCs & Air-conditioned PLC Panels Installation for Roller Mills

Relocated slave PLCs that were dismantled from 44 roller mills and installed them into combined air-conditioned panels with input and output cable extensions.

Delmon Edible Oil Mills Yanbu

Installation of grounding rods and networks for MV & LV panels.

Yanbu National Petrochemical Company (Yansab)

Laying, IR & HI-POT testing, and termination of MV cables.

Rerouting of Instrumentation Conduiting & Cabling

Relocation of instrumentation panels, along with conduiting and cabling works for the upgrade of gas turbine stations.

Rabigh 3 Independent Water Project

The laying, termination, testing, and glanding of power and instrument cables.

HVAC Panels Replacement

The supply, installation, and replacement of an HVAC Panel, including motor connection and termination.

Marafiq TP-9

Rehabilitation of workers’ locker rooms, bathrooms, and offices.

Repair of 34.5KV XLPE MV Cable for HDPE

Removal and laying of a 12-loop cable between two transformers. It also included the installation of Raychem MV power cable indoor end termination kits and post-termination testing with VLF & IR.

Marafiq (Different Site)

Installation of motorised shutter doors at various Marafiq site locations.

E&I Construction Works of Edible Oil Bottle Filling Plant

Complete supply, installation, testing, and commissioning of electrical & instrumentation equipment. This included cable trays, cable ways, lightning, grounding, earthing, MV cables, transformers, LV & MV panels, motors, actuators, sensors, flow transmitters, PLC controllers, local stations, and slave PLC panels.

E&I Construction Works of Animal & Poultry Feed Mills

Complete installation, testing, and commissioning of electrical & instrumentation equipment. This included cable trays, cable ways, lightning, grounding, earthing, MV cables, transformers, LV & MV panels, motors, actuators, sensors, flow transmitters, PLC controllers, local stations, and slave PLC panels.

E&I Construction Works of Downstream Extension MV/LV Substation Project of Soya-2

Complete supply, installation, testing, and commissioning of MV substation panels, which included the installation, testing, oil filling, and commissioning of a 4.5 MVA transformer.